Stephen  makes a quick trip up on Saturday 9th Oct to view progress further to some serious clearance with a digger!  The difference in how the site looks is incredible and it becomes more apparent how much space we have now the real levels have been established.  Apparently there were about ten wagon loads of earth removed.



Ground level has dropped by up to 4ft in places
 

A drain that suffered some damage during the works, but was duly repaired!  Now we know where the foul drain is!


To the front of the bothy - the damp patch on the wall shows where the ground level was up to here . .


The site looks bigger than previous


x6 conifer roots removed from beside the gate


Shows the extent to which the levels have been dropped behind the bothy

















After this milestone, the next one is the fence . . .